Recent Projects
This was a new development phase of 34 additional lodges, a pond and an amenity building on an existing holiday park site where we provided a full groundworks package from the initial top soil strip to a Tarmac finish. On arrival, the site was a field on which we created access roads, poured and finished concrete pads, formed services in and out and dug a large pond using various pieces of plant machinery which all men are ticketed for. The scale of this project required us to work closely with a number of other trades and agencies to ensure a smooth venture from start to finish.
This project consisted of the breakout of existing concrete and dig down to formation, which we then built back up with stone and meshed before pouring a 200mm high quality fibred concrete in two separate pours.
This landscaping project was undertaken to create a large driveway and private car park where gravel matting was laid and filled to a metal edge; this also included a foundation dig and pour ready for an office and garage to be built. Electric gateposts were installed with all ducting work set up and ready for wiring.
For this project, we replaced the failing gabion baskets at a stream on a small holding to create a deeper area with a water link to a ditch and pond.